What is the difference between brownfield and greenfield in industrial manufacturing modernization?
Answered at 12:15 in Built for the Operator: Julio Velasco on Design, Education, and a Career Shaped by Ignition · Ignited: Striking Industrial Automation Conversations
What is the difference between brownfield and greenfield in industrial manufacturing modernization?
A brownfield is an existing factory that has been built and operating for decades with mixed legacy equipment like PLC5, Siemens, Mitsubishi, and Omron controllers. A greenfield is a brand new installation with everything built from scratch. Brownfield facilities must evolve incrementally by acknowledging their diverse OEM equipment and integrating them through data concentrators, whereas greenfield projects like new data centers can implement fresh technology from the start.
Full answer and detailsRead the whole answer, key facts and every other question from this episode
In short
A brownfield is an existing factory that has been built and operating for decades with mixed legacy equipment like PLC5, Siemens, Mitsubishi, and Omron controllers.
Julio Velasco, Founder at IOScada · Built for the Operator: Julio Velasco on Design, Education, and a Career Shaped by Ignition · Ignited: Striking Industrial Automation Conversations · answer at 12:15
Key takeaways
- A brownfield is an existing factory that has been built and operating for decades with mixed legacy equipment like PLC5, Siemens, Mitsubishi, and Omron controllers.
Quote to remember
“It's a gradual thing where you're basically getting all the devices that are edge devices or not even part of a network and then bringing them up to a point where now you communicate with them, which that's a huge feat.”
— Julio Velasco
The full answer · about 2 min
A brownfield is an existing factory that has been built and operating for decades with mixed legacy equipment like PLC5, Siemens, Mitsubishi, and Omron controllers. A greenfield is a brand new installation with everything built from scratch. Brownfield facilities must evolve incrementally by acknowledging their diverse OEM equipment and integrating them through data concentrators, whereas greenfield projects like new data centers can implement fresh technology from the start.
Key facts
- 2008-2009: Financial crisis period when Julio joined Inductive Automation / Calmetrics after being laid off
- 80 percent: Software licensing costs as portion of integrator project costs that frustrated Steve Heckman
- 20-30 percent: Remaining profit margin for integrators after software licensing fees
- Nearly 2 decades: Duration of Julio Velasco's involvement with Inductive Automation ecosystem starting around 2008
- Hundreds of plants: Number Julio has visited where operators don't know what firmware versions run on their PLCs
People, companies and topics mentioned
More answers from this episode
- 4:00Why is automation considered recession-proof in manufacturing?
- 8:00Why did Steve Heckman create Inductive Automation and Ignition instead of building another SCADA tool?
- 19:50What is the problem with Industry 4.0 implementations that only add sensors and screens to legacy machines?
- 24:00What is the first step Julio Velasco takes when assessing a manufacturing facility for digital transformation?
- 24:50How does modernizing from serial-based protocols like DH45 to Ethernet-based communication improve factory infrastructure?