What safety incident occurred during night shift work on an active railway bridge construction?

Answered at 10:00 in Episode 7.9: Ray 'Rowdy' Smith (Pt. 1) · Creatures of the Industry

— questions searchable right now

What safety incident occurred during night shift work on an active railway bridge construction?

During the Long Walk railway bridge project, there was a night when the overhead power lines for the trains were supposed to be turned off but weren't, leaving the live lines energized while workers in scissor lifts were operating between them. The union health and safety crew intervened to prevent catastrophe, but it was described as a very hairy night and catastrophe averted.

Ray Smith on Creatures of the IndustryAll answers from this podcast →
Full answer and detailsRead the whole answer, key facts and every other question from this episode

In short

During the Long Walk railway bridge project, there was a night when the overhead power lines for the trains were supposed to be turned off but weren't, leaving the live lines energized while workers in scissor lifts were operating between them.

Ray Smith · Episode 7.9: Ray 'Rowdy' Smith (Pt. 1) · Creatures of the Industry · answer at 10:00

Key takeaways

  • During the Long Walk railway bridge project, there was a night when the overhead power lines for the trains were supposed to be turned off but weren't, leaving the live lines energized while workers in scissor lifts were operating between them.

The full answer · about 2 min

During the Long Walk railway bridge project, there was a night when the overhead power lines for the trains were supposed to be turned off but weren't, leaving the live lines energized while workers in scissor lifts were operating between them. The union health and safety crew intervened to prevent catastrophe, but it was described as a very hairy night and catastrophe averted.