Ray Smith and his mate Ed patched approximately 30 kilometres of Eastlink over a period of a few years working with Clifton. They were subbed out to contractors like Hollands or Fiesa and given a ute with their gear to work their way through the patching sections.

Ray Smith on Creatures of the IndustryAll answers from this podcast →
Full answer and detailsRead the whole answer, key facts and every other question from this episode

In short

Ray Smith and his mate Ed patched approximately 30 kilometres of Eastlink over a period of a few years working with Clifton.

Ray Smith · Episode 7.9: Ray 'Rowdy' Smith (Pt. 1) · Creatures of the Industry · answer at 15:00

Key takeaways

  • Ray Smith and his mate Ed patched approximately 30 kilometres of Eastlink over a period of a few years working with Clifton.

The full answer · about 2 min

Ray Smith and his mate Ed patched approximately 30 kilometres of Eastlink over a period of a few years working with Clifton. They were subbed out to contractors like Hollands or Fiesa and given a ute with their gear to work their way through the patching sections.

More answers from this episode

 ·  All answers from Creatures of the Industry →
—
—
0:00
0:00