What safety concern arose during railway station upgrade work at Nunna Wadding?
Answered at 20:00 in Episode 7.9: Ray 'Rowdy' Smith (Pt. 1) · Creatures of the Industry
What safety concern arose during railway station upgrade work at Nunna Wadding?
At Nunna Wadding station, approximately 40 workers were trying to work in an area of only 10 to 20 square metres, which Ray Smith identified as a disaster waiting to happen. When he raised concerns about the dangerously crowded workspace, management dismissed his safety worries.
Full answer and detailsRead the whole answer, key facts and every other question from this episode
In short
At Nunna Wadding station, approximately 40 workers were trying to work in an area of only 10 to 20 square metres, which Ray Smith identified as a disaster waiting to happen.
Ray Smith · Episode 7.9: Ray 'Rowdy' Smith (Pt. 1) · Creatures of the Industry · answer at 20:00
Key takeaways
- At Nunna Wadding station, approximately 40 workers were trying to work in an area of only 10 to 20 square metres, which Ray Smith identified as a disaster waiting to happen.
The full answer · about 2 min
At Nunna Wadding station, approximately 40 workers were trying to work in an area of only 10 to 20 square metres, which Ray Smith identified as a disaster waiting to happen. When he raised concerns about the dangerously crowded workspace, management dismissed his safety worries.
More answers from this episode
- 2:00How did a music industry professional transition into construction labouring in 2004?
- 5:00What contamination issues were encountered on the Coot Island redevelopment project?
- 10:00What safety incident occurred during night shift work on an active railway bridge construction?
- 12:30What unusual item was discovered embedded in a concrete deck pour on the Long Walk bridge?
- 15:00How long did workers spend on road patching work on the Eastlink project?
- 15:45What injury recording practices did contractors try to enforce on the Eastlink project?
- 16:40What union agreements governed work conditions on the Eastlink project?
- 24:00How did different contractor management styles affect worker conditions on the Eastlink project?
- 25:55What workplace facilities issue did a union delegate address on the Heatherhill Road overpass section of Eastlink?
- 30:30What was the significance of school construction projects during the global financial crisis period?