What operational challenges arise from liquid cooling in AI infrastructure during the decommissioning process?

Answered at 12:08 in The Circular Supply Chain for AI Hardware · The Dynamo Show: a Dynamo Ventures Podcast

— questions searchable right now

What operational challenges arise from liquid cooling in AI infrastructure during the decommissioning process?

GPU systems with liquid cooling are heavier and more valuable than air-cooled CPU systems, requiring additional handling steps to ensure proper management. Once equipment reaches Iron Mountain facilities, the core processes remain the same, but the company needs significantly more power and cooling distribution units to handle the cooling element of systems. As racks scale from 12-15 kilowatts to 100 kilowatts and beyond, only a limited number of companies have the infrastructure capability to test such systems, which Iron Mountain plans to build out worldwide.

Tom Delahunty on The Dynamo Show: a Dynamo Ventures PodcastAll answers from this podcast →
Full answer and detailsRead the whole answer, key facts and every other question from this episode

In short

GPU systems with liquid cooling are heavier and more valuable than air-cooled CPU systems, requiring additional handling steps to ensure proper management.

Tom Delahunty, VP of Operations for Asset Lifecycle Management at Iron Mountain · The Circular Supply Chain for AI Hardware · The Dynamo Show: a Dynamo Ventures Podcast · answer at 12:08

Key takeaways

  • GPU systems with liquid cooling are heavier and more valuable than air-cooled CPU systems, requiring additional handling steps to ensure proper management.

Quote to remember

“I see it as a supply chain opportunity. I would look, my lens says those assets have a future in life.”

— Tom Delahunty

The full answer · about 2 min

GPU systems with liquid cooling are heavier and more valuable than air-cooled CPU systems, requiring additional handling steps to ensure proper management. Once equipment reaches Iron Mountain facilities, the core processes remain the same, but the company needs significantly more power and cooling distribution units to handle the cooling element of systems. As racks scale from 12-15 kilowatts to 100 kilowatts and beyond, only a limited number of companies have the infrastructure capability to test such systems, which Iron Mountain plans to build out worldwide.

Key facts

  • Iron Mountain serves almost 225,000 organizations with data storage and records management
  • Q4 2025: approximately 70% year-over-year growth in asset lifecycle management
  • Q2 2025: plus 88% year-over-year growth and plus 82% organic growth
  • One international customer's decommissioning project spans five months and touches seven countries
  • AI infrastructure racks scale from 12-15 kilowatts up to 100 kilowatts and beyond

People, companies and topics mentioned

Iron MountainAsset Lifecycle ManagementIT Asset Disposition (ITAD)NIST compliance standardsGoogle research on hardware longevityCarnegie Mellon University research on technology lifespanGPU and AI infrastructureHyperscale data centers

More answers from this episode

 ·  All answers from The Dynamo Show: a Dynamo Ventures Podcast →
—
—
0:00
0:00